Project Portfolio - Hampton Inn - Dunn, NC

The five story Hampton Inn began as a project utilizing concrete block walls. A value engineering analysis initiated by the EOR and performed by TSN determined that SigmaStud® would provide a substantial savings compared with the original materials, enabling the project to move forward under a reduced budget. The lightening of the structure and redistribution the loads to the foundation resulted in the elimination of geo-piers and switch to typical spread footings. The total savings provided from the switch to SigmaStud® was $300,000.

Old Dominion University
Quad Housing

Hilton Garden Inn,
Southpoint – Durham, NC

UNC-G Dormitory -
Greensboro, NC

Venice Lofts -
Manayunk, PA

Wyndham Hotel -
Gettysburg, PA

Click on an image for a closer look
Products are available through local distribution.