Featured Light Steel Framing News:
No Results Found
The page you requested could not be found. Try refining your search, or use the navigation above to locate the post.
Light Steel Framing News
Lighter Better | Faster Stronger Training Series – National Dates
The Lighter Better | Faster Stronger Training Series is presented by The Steel Network (TSN) and Applied Science International (ASI). The training series covers a number of topics including Cold Formed Steel Design, Building Information Modeling (BIM), Demolition,...
SteelSmart System 7.6 Released
SSS recently tuned 23, and even though it may be getting up there in years, we are just as committed as we were in the beginning to ensuring it is kept up to date and stays the most advanced light steel framing design tool on the market. We are constantly improving...
Lighter Better | Faster Stronger Training Series – Orlando, FL
The Lighter Better Faster Stronger is a 4 day training series (2/19 – 2/22) and consists of 2 sessions. Attendees may sign up for one or both sessions: Session 1: Performance Based Design for Progressive Collapse Session 2: Light Steel Framing Design & Building...
CFS Design & BIM Framing Training
Lighter Better | Faster Stronger, is the first of a new training series being presented by The Steel Network (TSN) and Applied Science International (ASI). The seminar is split into two days, the first day is focused on advancements in Light Steel Framing and...
StiffClip® PLC (Panel Lift Clip) – New Product!
The StiffClip® PLC assists with lifting and placing assembled wall panels with an overhead crane. Clip attaches to stud within panel with approved fasteners, extending through the top track to allow cables to be threaded through the large hole, and the assembled panel...
DriftTrak® Headed Stud – New Product!
DriftTrak® Headed Stud saves the time and expense of installing DriftTrak after the concrete slab has been poured, by integrating it directly into the slab before pouring. The headed studs come preinstalled to the DriftTrak and function as the attachment to the slab...
SteelSmart System 7.5 Released
We’re happy to announce the release of SteelSmart® System (SSS) Version 7.5! SSS 7.5 includes new code changes for 2015 IBC, AISI S100-12, & ASCE 7-10, updates to several modules, and the addtion of several new products from The Steel Network. For a list of new...
Remembering Veterans this Memorial Day
As a veteran owned and operated business for more than 25 years, we at TSN recognize our fallen veterans and support those veterans still struggling at home. From now until June 2nd, a portion of the processds on full skids of our most widely used clip, MasterClip...