UNC Nash Patient

Project At A Glance

The Job

Location

Rocky Mount, NC

Hospital expansion

Building

7-Story Concrete

Ground floor to penthouse

Scope

Exterior Panels & Custom Eyebrows

Prefabricated, ACM finish

Prefab Partner

Advanced Exterior Systems

Design-assist partner

The Approach

Built in the Shop. Flown into Place.

Advanced Exterior Systems is responsible for the
tower’s exterior: the cold-formed metal framing
around the curtain wall, finished in ACM, from
the ground floor to the penthouse — plus vertical
and horizontal architectural eyebrows.

What makes this job unique is how much arrives
already done. Panels show up fully assembled and
are flown into place, so there’s no plating to
add later — and the complex eyebrow forms are
built at ground level instead of on a swing stage.

It’s an uncommon structure for healthcare
construction in North Carolina, and TSN supplies
key components throughout the prefab process.

Every Panel Arrives With
1 Cold-formed metal framing
2 Sheathing
3 Air & vapor barrier
4 Girts
5 ACM finish — installed before it ships

Prefabricated Exterior Panels

Framing, sheathing, air barrier, girts and ACM
are completed off site, then each panel is
flown into place — cutting installation time
on the façade.

Custom Eyebrows

Vertical and horizontal eyebrows are prefabricated too. Building these complex forms on a swing stage is slow and quality tends to lag — the shop avoids both.

 

Why prefab

The best method for the logistics and the timeline

Quality of Work

Shop conditions instead of swing stages
keep complex assemblies consistent.

Air Barrier Integrity

The air and vapor barrier is installed and checked
before the panel ever leaves the shop.

Time Off the Schedule

Flying in finished panels shaves a tremendous amount
of time off exterior construction.